GIS and Maintenance Management for Small Utilities

Utilities and public works organizations often face a daunting task when it comes to efficiently managing maintenance schedules and routine activities that are required to properly maintain public infrastructure.

The video below demonstrates a simple way to integrate maintenance management with GIS to easily keep track of calendar events and scheduled maintenance.  We put this short video together to show how smaller utilities can benefit from the built-in calendars and scheduling tools in Elements while leveraging their GIS investment.

Super Mario Bros. and GIS-Based Work Management Systems

In 1985 Super Mario Bros. was released in United States and was the best-selling video game of all time for over two decades (until Wii Sports outsold it in 2009).

Part of the reason Super Mario Bros. was so successful is because Mario was able to eat those gigantic Mushrooms and double his size – giving him the ability to take an extra hit from most enemies and break those red bricks with ease (he could also shoot fire balls if he ate the Fire Flower, which was pretty cool).

In Super Mario Bros. 2 he gained a different power – you’ll remember that Mario was able to pull up weeds out of the ground (which would turn into bottles of magic potion), and throw those bottles of potion on the ground to create magic doors – leading to an alternate world where he could make himself rich by collecting lots of coins.

Then, in 1990, came Super Mario Bros. 3 – a billion-dollar-plus gross revenue producer that gave Mario his best powers yet:

  1. He learned to fly (always wished I could do that), and
  2. He got a GIS-based work management system.

Apparently sometime between 1985 and 1990 Mario realized he could do his job better if he could see his work on a map.

Marios GIS and Work Management System

Mario's GIS-based work management system

Ironically, it was about that same period that companies began using GIS together with their asset and work management software.  Originally these systems were crude and extremely difficult to implement and maintain – however they’ve come a long way and today’s GIS-based work management systems are much more manageable.

GIS-based work management software

A modern version of Mario's GIS-based work management system

My favorite thing about Mario’s GIS-based work management system is the dancing cacti and cheerful background music.  My favorite thing about modern GIS-based work management systems is the ability for organizations to see where their Work Orders are taking place, use the maps to manage maintenance activities, and visualize work history patterns.

Here’s a quick video demonstrating GIS integration with asset management software:

And just for fun, here’s a video that shows you how to beat Super Mario Bros. 3 in record time (note the dancing cacti and great music that accompany the maps):

…who knows, maybe someday we’ll see dancing cacti and cheerful background music as added features in GIS-based asset and work management software. :)

Small City Hits Big Homerun with GIS & Asset Management Software

West Point, UT – The city of West Point, UT has recently expanded their GIS and work management software, reducing costs and increasing return on investment.

As one of the fastest growing cities in Utah, West Point adopted Elements Management Software by novotX in late 2006 to integrate their developing GIS with a work management package.   Top priorities for the city included the ability to create work orders, log phone calls, keep track of job costing, and manage maintenance schedules in a GIS-centric environment.

Recently West Point has recently expanded the software to manage business licenses, building permits, inspections, and certificates of occupancy in a GIS-centric environment.

Boyd Davis, City Engineer and GIS Administrator, says the greatest advantage of using Elements is that the software “combines many functions into one user-friendly software package. “

“Our greatest success so far has been implementing the inventory tracking features.   When our public works employees complete a work order they input the amount of time spent on each work order and any parts or supplies that were used during the job.   This makes it easy for us to keep track of where our time and resources are being spent.   The need for asset management and work order tracking is something that every city needs” says Davis.

Since the original implementation of Elements Management Software, additional departments have taken advantage of the technology and the software now reaches far beyond public works.   West Point is currently using Elements Management Software in the following departments:

  • Water Department
  • Wastewater Department
  • Code Enforcement
  • Building Department
  • Permits & Licenses

Plans to expand Elements Management Software into additional departments are currently in the works.

About West Point

West Point is a community of 11,000 situated just 30 minutes north of Salt Lake City, along the shore of the picturesque Great Salt Lake. One of the fastest growing communities in Utah, West Point is fast becoming one of the finest and most vibrant communities in the Beehive State.   Visit www.westpointcity.org to learn more.

About novotX

Located near Salt Lake City, UT, novotX publishes GIS-centric asset and work management software for governments and utilities.     Elements Management Software, the flagship product of novotX, allows integration with any industry-standard GIS platform to provide a simplified, cost-effective approach to GIS-based asset and work management.

For more information contact:

Justin Gough

novotX, L.L.C.

801.682.1400

justin@novotx.com

www.novotx.com

Follow novotX on Twitter @ novotX_GIS

Rubik’s Cube vs. GIS-Based Asset & Work Order Management Software

Raise your hand if you can solve a Rubik’s Cube.  Don’t worry, you’re reading this by yourself and nobody realized that you didn’t put your hand up.  The truth is not many people can solve them (if you solved yours by peeling off and rearranging the last 2 stickers it doesn’t count).

Rubik's Cube

The original 3 x 3 x 3 Rubik's Cube. Working with GIS-based asset and work management software can be a lot like solving a Rubik's Cube.

The original 3 x 3 x 3 Rubik’s Cube was first introduced in 1974 and has since caused hours of confusion and frustration for people all around the globe.

GIS-based asset management software was introduced about 15 years later and has caused equal amounts of confusion and frustration – especially for governments and utilities.  In fact, given the opportunity to choose between figuring out a Rubik’s Cube and figuring out some fancy new GIS-based asset and work management software, I best most people would take the cube.

When properly executed, combining GIS with asset management and work order software provides huge returns on investment for governments and utilities around the world every day.  However if not done properly, attempting to implement a GIS-centric asset and work order management system can quickly turn into the deepest money pit you’ve ever seen.

Here are a few quick tips to avoid potential disaster:

  1. Start with a 3 x 3 x 3 cube. Have you ever seen those crazy cubes that are odd shapes and have many sizes?  Yes, they look fun and exciting – but the more sides and the more twists and turns on a Rubik’s Cube, the greater the challenge.  Same goes for your software – the more bells and whistles you cram into your GIS-based work order software, the more complications you are likely to encounter.  You can always expand as needed – remember to keep it simple (especially up front) and make sure you select something that fits the needs of your organization!
  2. Don’t peel off the stickers. I know, it’s tempting…  Just peel off those last two stickers and be done with the stupid thing.  The truth is the cube will never look the same once you start peeling off the stickers – and the more stickers you peel off, the more likely you’ll never get them back to their rightful places.  With your GIS-based asset management software the same principle applies – don’t cut corners – the more you try to hack things together and make do with the wrong tools, the more likely you are to face complications.  And just like the stickers, once you’ve peeled off enough of those things the only way to fix it is to buy a new cube.  Luckily cubes are cheap, software is not.
  3. Don’t give up! Even the 3 x 3 x 3 cube can be a challenge at first.  But remember, just like the Rubik’s Cube, if you read the instructions (and maybe get a little bit of training) you’ll be just fine (if your software didn’t come with instructions or training you’re in trouble).

As a side note, I’d be interested to see how many people who read this post can solve a 3 x 3 x 3 cube.  If you can solve a cube, leave a comment and I’ll compare that to the number of hits this post receives over the coming weeks and I’ll post the results for anyone who’s interested!

GIS & Work Management Software: 6 Quick Tips for Government & Utilities

Utilities and government face a unique set of challenges when selecting work management software.  Here are a couple of things to keep in mind as you go through the selection process:

1. Keep it map-based.

Governments and utilities can maximize their GIS investments and save big dollars by selecting work management software that integrates with the organizations mapping infrastructure.  Several work management software applications allow integration from any industry-standard GIS technology including ESRI, MapInfo, Manifold, Autodesk, and others.

2. Keep it simple.

Avoid work management software that is complicated to understand or that involves an extensive learning curve.  Remember – even though you may understand the technology, many people who will ultimately be using the system may not be so tech savvy.  It may not be a bad idea to have a few of the end-users sit in on a demo or two and see if they think the software is easy enough to understand.

3. Keep it accessible.

Whichever application you select, make sure you can access your data while on the go.  Real-time access (via the web) to GIS and work management data is critical to field workers and remote operators.  By taking advantage of the web and real-time field access, dispatchers and receptionists are also likely to smile a bit more because communication between field and office staff will improve – making their jobs much easier.

4. Keep it open.

Few things are worse than having lots of great data locked down in a proprietary database.  It’s your data – make sure you can get it when you need it!  It’s also a great idea to find something that’s built on an industry-standard open platform (such as the Microsoft .NET framework) so you can integrate with third-party applications if necessary.  Governments and utility systems can greatly benefit by integrating their work management software with utility billing, financials, and other applications.

5. Keep it affordable.

Remember, you get what you pay for.  We’re not looking for free here – we’re looking for a solid application that fits our needs and fits our budget.  Enterprise work management software generally entails a bit of configuration to match the specific needs of your organization.  Also, if you select a firm that knows what they’re doing you’ll likely receive some pretty good consulting and best-practice information along the way.

6. Keep it manageable.

If you don’t have a large IT department and a large staff, avoid work management software that requires those things.  Remember, once the software has been implemented and your staff has been trained, you’ll have to support this thing.  Work management software comes in all sorts of packages, so be sure to consider all of your technological options before you purchase (hosted solutions, software as a service (SaaS), on-site deployments, etc.).

Comments?  Experiences selecting work management software that you’d like to share?  Let us know!

GIS, Work Order Software, & Kate Gosselin

Kate Gosselin

Kate Gosselin on ABC's Dancing With the Stars

Anyone who was able to stay awake through Kate’s completely uninspiring performance on Dancing with the Stars deserves some recognition.  You can watch it here, starting at 41:44.

http://abc.go.com/watch/dancing-with-the-stars/93512/258773/week-five

Of course my mind began to wander as I suffered through the dance.  Oddly enough, I began to draw several parallels between that particular performance and integrating GIS with work order software.

With Kate’s painfully boring performance in mind, here are a few quick tips for utilities and local governments looking to implement GIS-centric work order management software:

1. Select software that’s a good match for your company.

Unfortunately Tony Dovolani (Kate’s dancing partner) did not get to choose who he danced with.  Luckily, you do. Remember, you’re entering a long-term relationship with both the work order software and the vendor – so choose carefully!  Tony put it best when he said “Kate has no motivation and I have to push her each week, it gets exhausting.” Nobody wants to say that about the work order software they selected (or the vendor responsible for the implementation)!

2. Simple is best.

Let’s face it; Kate’s performance was painful for everyone – judges, spectators, and even Ms. Gosselin.  As simple as the dance routine seemed, it was evidently way too complicated for the mother of 8.  Remember, your GIS and work order software will be used by field staff and other workers who are not familiar with GIS.  You’re likely to face a steep learning curve if you overcomplicate things – so when it comes to GIS and work order software, make it easy!

3. Get the attention you deserve from your vendor.

Kate’s excuse for such a terrible performance was that her children were in town that week (yes, all 8 of them) and she had little time to rehearse.  Remember, if the vendor you select is too busy with their boat load of children (other customers), performance will suffer.  Make sure you’re the important customer.  Be the big fish in their pond – the customer that gets all of the attention because you are the most valuable client to that particular vendor.

In summary, there was nothing exciting about Kate’s performance – except that it ended.  Implementing new technology (especially neat tools like GIS and asset management software) should be exciting!  It will save time, save money, and make your job much easier if it’s done correctly.

Homer Simpson & GIS-Based Asset Management Software

In a memorable episode of The Simpsons (Season 2, ‘O Brother, Where art Thou?’), Homer discovers his long lost brother Herb (who owns a car manufacturing plant). Homer and Herb bond while Homer gets the chance to design his own car (which he ultimately names “The Homer”).

At the end of the episode, “The Homer” turns out to be a monstrosity – a complete disaster to say the least. The car is green, with rocket-like fins, the horn plays “La Cucaracha,” and the price tag is north of $200,000.

What does this have to do with GIS-based work order and asset management software? A lot.

When searching for a GIS-based asset and/or work order management package it’s easy to fall into a trap searching for the do-everything-system that has every bell and whistle known to man in an effort to get the most bang for your buck. The problem herein lies. We’ve seen too many people end up with a budget nightmare that is too complicated for the staff to learn, far too difficult to use, and impossible to support in future years. In summary, they end up with “The Homer.”

We’ve seen too many people end up with a budget nightmare that is too complicated for the staff to learn, far too difficult to use, and impossible to support in future years. In summary, they end up with “The Homer.”

When searching for GIS-based management software, take a minute to step back, think about the true needs of your organization, and remember that in some cases, less is definitely more.

Read an article in Public Works Magazine about the original presentation here.

Watch this episode of The Simpsons here.